The subdivision of the foundation can be divided into an inspection batch according to the foundation type. If the engineering quantity is large or the construction organization design and special construction plan require segmented construction...
CNAS-CI01:2012 7.3.Requirements: The inspection organization shall maintain a system of records (see 8.4) to demonstrate that the inspection procedures are carried out effectively and that the inspection activities are monitored.
Announcement No. 629 on the release of "Technical Regulations for Testing Compressive Strength of Concrete by Ultrasonic Resilience Comprehensive Method"
Wechat ID:123456789